Specifications:
Types Length | 45ft | 50ft | 55ft | 60ft | 65ft | 70ft |
13.75m | 15.25m | 16.80m | 18.30m | 19.85m | 21.35m | |
B ( 0°-2°) | ||||||
Top diameter (mm) | 200 | 200 | 200 | 200 | 200 | 200 |
Butt diameter (mm) | 345 | 370 | 395 | 415 | 435 | 455 |
Thickness (mm) | 6 | 6 | 6 | 6 | 6 | 6 |
E ( 2°-15°) | ||||||
Top diameter (mm) | 200 | 200 | 200 | 200 | 200 | 200 |
Butt diameter (mm) | 545 | 585 | 625 | 660 | 700 | 740 |
Thickness (mm) | 6 | 6 | 6 | 6 | 6 | 6 |
C ( 15°-30°) | ||||||
Top diameter (mm) | 250 | 250 | 250 | 250 | 250 | 250 |
Butt diameter (mm) | 600 | 645 | 690 | 730 | 770 | 805 |
Thickness (mm) | 6 | 6 | 6 | 6 | 6 | 6 |
D ( 30°-90°) | ||||||
Top diameter (mm) | 300 | 300 | 300 | 300 | 300 | 300 |
Butt diameter (mm) | 680 | 730 | 725 | 765 | 755 | 790 |
Thickness (mm) | 6 | 6 | 7 | 7 | 8 | 8 |
HS ( 0°-2°) | ||||||
Top diameter (mm) | 200 | 200 | 200 | 200 | 200 | 200 |
Butt diameter (mm) | 340 | 360 | 385 | 400 | 420 | 440 |
Thickness (mm) | 6 | 6 | 6 | 6 | 6 | 6 |
HT ( 2°-15°) | ||||||
Top diameter (mm) | 200 | 200 | 200 | 200 | 200 | 200 |
Butt diameter (mm) | 485 | 520 | 550 | 580 | 615 | 645 |
Thickness (mm) | 6 | 6 | 6 | 6 | 6 | 6 |
3T ( 15°-30°) | ||||||
Top diameter (mm) | 250 | 250 | 250 | 250 | 250 | 250 |
Butt diameter (mm) | 520 | 540 | 565 | 595 | 615 | 640 |
Thickness (mm) | 6 | 6 | 6 | 6 | 6 | 6 |
3D ( 30°-90°) | ||||||
Top diameter (mm) | 300 | 300 | 300 | 300 | 300 | 300 |
Butt diameter (mm) | 585 | 620 | 650 | 680 | 715 | 765 |
Thickness (mm) | 6 | 6 | 6 | 6 | 6 | 6 |
Installation
-Remove all the equipment on the pole during Assembly.
-Circle a sling around th epole shaft of each section.
-Fix the sling on top section to one pulley block.
-The sling on the bottom section is tightly fixed and fixed at the
center of gravity.
-Make the steel pole vertical by tighten the sling of the top
section.
-Fix the steel pole.
-Remove the sling.
Packaging & Shipping
Our poles as normal cover by Mat or straw bale at the top and bottom and wood between the poles to avoide the damage on the galvanization of the pole ,anyway also can following by client required , The loading capacity of 40HC or OT an be calulated calculation base on the client actually specification and data.
FAQ:
1. Price Term: EXW, FOB, CFR or CIF.
The price includes pole shaft, base plate, cross arm and anchor
part.
Shipping seaport: Shanghai Seaport. For FOB, CFR or CIF price,
please specify which exact model you need, and tell us your order
quantity so that we can calculate the local transport charges and
sea freight.
2. MOQ: 1 sets for Customized
3. Payment: Typically 30% by T/T as deposit, balance by T/T or L/C at sight
before shipment. Other payment way can be negotiated.
4. Delivery time : goods can be ready for shipment within 10 workdays after
receiving deposit.
5. Warranty : 30 years
6.Surface treatment :hot dip galvanization
Test:
Before the loading,we can do the tensil test according to the customer's requirements.
Jiangsu milky way steel poles co.,ltd
Estbilsed in 1989,Jiangsu Milky Way Steel Poles is located in Wuxi,East of China ,near one of the largest sea port of China ,Shanghai,Port .
Our Products have been widely used in the power transmsion ,signal transmission and ligting for street ,road ,square ,palaestra.and so on
We have plenty of export experience . Since our first overseas order from Pakstan in 1991 of 132 KV transmission poels ,our products have been deliveried to more than 70 contries and areas ,including America,Australia ,Russia ,Genmery ,Span,Philippines ,Malaysia and so on
To assure our products qualified ,we take steps as follows :
1. Management team : We have employ the foreign export to take chaege of the overall managemnt ,especailly the technical managemnt and quality management .
2. Introducing ISO management ,We are awared ISO 9001:2008 certificate . .
3. Lofting and design software :We have transmisson power pole design software which can help us design all kinds of steel pole ,at the same time ,the TMA and LMA are adopted by us to provide the design the drawing accuratly .
4. QC Inpection:It is our company policy that all the finish product should be inspected by our specialzed QC in every manufacure steps and beofore every shipment .
We are always persisting in horzontal cooperation with domestic senior project institute and technical colleges .The enterprise also has an highly qualified team working at R&D ,manufacure ,QC ,aftersales service and other important positions .